5th July - Construction Update

Glen Iris construction update
July 05, 2019

Kitchens are in, stone-bench top and marble look splash backs have been ordered.

Plenty of space in our island benches.

Some of the detail that goes into our wainscoting installed on curved walls.

Sun drenched terrace of what will be our 2-Bedroom Premier Apartment. Picture a 3-seat couch plus 2 arm chairs and coffee table, a 6-seat dining table and 2 sun lounges.

Tilers have now started.

Traditional 4 panel design on our sliding doors.

Wainscoting has been installed on Level 2.

Waiting for the bench tops to arrive for our full size Island kitchens.